Union Coop Al Barsha – 3 Commercial Center 40% Complete
Last Update: Saturday, May 23, 2020 : 12:13 (+4GMT)
Union Coop is looking forward to expand its presence further in the emirate of Dubai
Dubai, United Arab Emirates, May 23, 2020:
Dubai, United Arab Emirates, May 23, 2020: The largest Consumer Cooperative in the UAE, Union Coop through its ‘Investment Division’ has revealed that its Commercial Center project in Al Barsha – 3 area is 40% complete. The move comes within the framework of Union Coop’s plan for strategic expansion and increasing its outreach to serve the members of society, and contribute to obtaining a unique shopping experience. The new branch will increase Union Coop’s strategic inventory by 11%.
Commenting on the project, H.E. Khalid Humaid Bin Diban Al Falasi, CEO of Union Coop said: “The total cost of the project is estimated at AED 60 Million, and the project consists of basement, ground, mezzanine and first floor, where basement floor will be allocated to parking facilities for consumers and shoppers, in addition to providing stores for the branch along with shoppers service facilities such as toilets, ablutions and prayer rooms.”
Al Falasi added that: “The news branch is spread over an estimated area of 50,000 sq. ft. with the total build up area of about 148,000 sq. ft. The new site is characterized by a direct view of Hessa Street, which connects Al Khail Street and Sheikh Mohammed bin Zayed Street with Dubai Marina region and the Sheikh Zayed Road. The branch will be able to serve the residents of Al Barsha, Al Barsha South, Marina and TECOM area.”
The CEO further added that the new branch would allocate the ground floor to 12 commercial, service stores and 16 point of sale counters, in addition to space for shoppers' car parking. The first floor of the center will consist of Union Coop hypermarket, covering an area of 40,000 sq. ft. housing over 50,000 products, in addition to dedicated sections of fresh food products such as a bakery, fishery, butchery, vegetables & fruits section, dairy section, spices, legumes, date, coffee and honey.
Work is currently underway to complete the concrete structure of the building at the end of casting the roof and floor surface, which is expected to be completed this week. Electromechanical and finishing work has also been carried out for the basement and ground floors.
Below is the timeline for the project implementation stages:
Project Stage Start Date End Date
Preliminary Stage – Drilling and Excavation 15/05/ 2019 15/06/ 2019
Excavation, Drilling and Shoring 16/06/ 2019 21/09/ 2019
Preparatory Phase – Key Implementation 21/09/2019 15/10/ 2019
Foundation 01/10/ 2019 30/12/ 2019
Casting – Ground Floor Roof 02/01/2020 23/02/2020
Casting – First Floor Roof 24/03/2020 28/03/2020
Casting – Mezzanine Floor Roof 29/03/2020 15/04/2020
Casting – Roof top 16/04/2020 20/05/2020
Electro-Mechanical works and Finishing of the Basement 16/03/2020 07/10/2020
Electro-Mechanical works and Finishing of the Floor 20/04/0202 08/10/2020
Electro-Mechanical works and Finishing of the First Ground Floor 21/05/2020 10/10/2020
Electro-Mechanical works and Finishing of the Mezzanine Floor 10/06/2020 29/09/2020
Electro-Mechanical works and Finishing of the Roof top 25/06/2020 10/11/2020
Façade works 11/07/2020 01/11/2020
Testing and Operating works 17/10/2020 15/11/2020
Delivery/Handover 15/11/2020 21/11/2020
Previous Article
SCAD Building Materials Price Report Construction Labour Costs an...
Next Article
Union Coop Launched ‘Drive Thru' Shopping Service
Most Viewed – Last 30 Days
- PoCs Prove Industry is Ready for Contactless Travel... [7157-Views]
- Federal Tax Authority Obtains Corporate Ethical Procurement and Supply Certifi... [2408-Views]
- Deerfields Mall records 11% footfall growth in Q1, reinforcing its position as... [2344-Views]
- SHEGLAM Drops Two New Beauty Essentials: The Brow-Fection Micro-Stroke Liquid... [2269-Views]
- The UAE Becomes a Top 10 Global Exporter, Latest WTO Figures Show... [2265-Views]
- SalamAir Releases First Quarter (Q1) 2026 On-Time Performance Results... [2240-Views]
- Uae Pavilion Pergola From Expo 2025 Osaka Finds A New Home In Japan... [2228-Views]
- Etihad launches Dhaka services, strengthening trade and cargo links between th... [2213-Views]
- To Empower Emirati Talent Ministry Of Culture Launches ‘Fifth Cycle of Nation... [2177-Views]
- Redefining Retail with Purpose: Mercato Leads Dubai as the Only Licensed Autis... [2171-Views]
- Malabar Gold & Diamonds Launches Relocated and Expanded Showroom at Visakhapat... [2097-Views]
- Ericsson and du enhance Fixed Wireless Access services in the UAE... [2060-Views]
- Federal Tax Authority Conducted 176,000 Market Inspection Visits in 2025, Up 8... [2052-Views]
- UAE Aa2 Rating with Stable Outlook Unchanged Following Moody's Ratings Periodi... [2039-Views]
- “My Family is Reading”: Dubai knowledge model for driving wider social impact,... [1817-Views]
- Oakley meta vanguard debuts prizm™ transitions® in new colorway launch... [1803-Views]
- Dubai Gold District Launches Concierge Home Delivery for Gold and Jewellery Pu... [1786-Views]
- DWTC Welcomes Nearly 3 Million Participants in 2025, Reinforcing Dubai's Posit... [1687-Views]
- Stay Cool and Connected: LG's Smart AC Technology Redefines Gulf Comfort... [1656-Views]
- World Champion Tadej Pogačar Targets Maiden Paris-Roubaix Victory... [1653-Views]





