Incoming Raw Material Inspection: To check the incoming raw materials (Given below) from suppliers that meet the COA & International standard Specification. 1. Polyester & Vinylester Resins 2. Fiberglass Rovings ( Hoop & Chop Roving) 3. Emat, Woving Roving Mat & C Glass 4. Polyol & Iso...
Additional Information
The Role Incoming Raw Material Inspection: To check the incoming raw materials (Given below) from suppliers that meet the COA & International standard Specification. 1. Polyester & Vinylester Resins 2. Fiberglass Rovings ( Hoop & Chop Roving) 3. Emat, Woving Roving Mat & C Glass 4. Polyol & Iso-cyanate 5. Catalyst (MEKP) & Cobalt Octoate Qualification Tests (Long term tests): To know the procedure and knowledge to conduct the below qualification tests as per international standards. 1. Hydrostatic Design Basis Test (HDB) as per ASTM D 2992 2. Longterm Chemical Test ( Strain Corrosion Test) as per ASTM D 3681 3. Beam Strength Test as per ASTM D 2925 4. Joint Tightness Test as per ASTM D 4161 All the quality records must be maintained upto date. The raw material inspection report, Final Inspection Report, Mechanical Testing Reports & Audit documents for NSF, FM, ISO & SASO are mandatory.
Requirements Expected Qualification : • Bachelore Degree in Chemical Engineering/Mechanical Engineering Knowledge & Skills : • Communication, leadership, analytical thinking, decision making, detailed work and problem solving Required Experience : • 3-7 years of experience in GRP Pipe & Fittings Manucfaturing Industry
About the company Saudi Pipe Systems Co. Ltd. (SPS) founded in 1995, designs and manufactures Ductile Iron Valves and Fittings, Fire Hydrants, HDPE, GRP and Pre-insulated pipes, and Manhole covers and gratings for water distribution, water transmission, irrigation and water treatment. The company is well poised to support and develop each project worldwide with a full range of water solutions.
Interested in this position? Click the button below to apply.